Leave Your Message
China Caf-Oil Sprayer & Depositor 2 in 1 Machine Factory - Advanced Cake Making with Labor Cost Savings - Suppliers
Hot Products

China Caf-Oil Sprayer & Depositor 2 in 1 Machine Factory - Advanced Cake Making with Labor Cost Savings - Suppliers

Introducing our innovative cake-making machine designed for efficient production without the use of paper cups. This advanced equipment features mould trays that move seamlessly forward for oil spraying and then advance to the depositor section for precise dough filling. With a state-of-the-art PLC system and a user-friendly touch screen interface, our cake maker ensures easy operation while significantly reducing labor costs. As a leading supplier and factory in China, we are committed to providing high-quality machinery to enhance your baking processes
  • Running Speed 15-25times/min
  • Oil Spraying Quantity 0.2-6g/time
  • Dough Depositing Quantity 10-100g time,adjustable
  • Voltage and Frequency 3ph,380V,50Hz

Specification

Running Speed 15-25 times/min
Oil Spraying Quantity 0.2-6g/time
Dough Depositing Quantity 10-100g time, adjustable
Voltage and Frequency 3ph, 380V, 50Hz
Power 5.5kW
Air Pressure 0.6-0.8MPa
Maximum Air Consumption 1m³/min (external gas source)
Dimension (L*W*H) 3500*1050*1650mm

Lubrication and Maintenance

Strict regulations for operation and maintenance are an important guarantee for normal functioning of the machine and prolonging its service life.
1

Regularly check the lubricating oil inside the decelerator and the conveyor stepper; supplement with it in time to a certain amount.

2

Regularly grease the conveyor chains with a little lubricating oil. Grease sliding parts such as the guide rod and the guide sleeve with cooking oil before work so as to ensure their smooth functioning.

3

Grease the double-body pressure regulating valve with oil and exhaust water in time so as to ensure the normal functioning of pneumatic components.

4

In order to ensure food hygiene, the machine must be washed and wiped clean before and after use. Do not use metal and thread tools that are prone to be unstitched to clean in case the valve core gets stuck.

5

Regularly check the fastening bolts of the cam control device to see whether they are loose.

6

Regularly check whether the sealing washer of the piston inside the ration pump is damaged or worn. If so, replace them in time.

7

Check on every part of the machine whether there are any bolts loose or falling off. If so, fix them tightly in time.

Frequently Asked Questions

What is the production speed of this depositing machine?
The machine operates at a running speed of 15 to 25 times per minute, providing consistent output tailored to your production demands.
Can the dough depositing quantity be adjusted?
Yes, the dough depositing quantity is fully adjustable within a range of 10g to 100g per deposit to accommodate different product sizes.
What are the power and air supply requirements?
The machine requires a 3-phase, 380V, 50Hz power supply with a power rating of 5.5kW. The pneumatic system requires an air pressure of 0.6-0.8MPa and a maximum air consumption of 1m³/min from an external gas source.
How should the conveyor chains and sliding components be lubricated?
Conveyor chains should be greased regularly with a small amount of lubricating oil. Sliding parts, such as the guide rod and guide sleeve, should be greased with cooking oil before starting operation to ensure smooth functionality.
What cleaning precautions are necessary to maintain food hygiene?
The machine must be thoroughly washed and wiped clean before and after every use. Do not use metal tools or loose-threaded cleaning fabrics that are prone to fraying, as loose particles may cause the valve core to get stuck.
What parts should be regularly inspected for wear and tear?
You should regularly inspect the lubricating oil inside the decelerator and conveyor stepper, check the fastening bolts of the cam control device, verify that all machine bolts are tightly fixed, and monitor the piston's sealing washer inside the ration pump for wear, replacing it when necessary.